Back
  • Expression 2: IRFU Upgrade Installation Guide

    Expression 2X, Concept 2X, and Impression 2:

    1. Open the console.
    2. Insert the IRFU EPROM into socket U55 making sure to align the chip and socket indentations.  The socket is located on the lower left hand area of the face panel PCB.
    3. Attach one end of the enclosed four pin cable assembly onto the connector marked J17 INFRARED.  The connector is located on the lower left hand area of the face panel.
    4. Thread the cable assembly through the wire loom.
    5. Attach the other end of the enclosed four pin cable assembly onto the connector marked J6 IR.  The connector is located on the right hand side of the power supply tray.
    6. Close the console and test for proper operation. 
      Refer to the User Manual to enable the IRFU.

    Insight 2, Insight 2X:

    1. Open the console.
    2. Insert the IRFU EPROM into socket U55 making sure to align the chip and socket indentations.  The socket is located on the upper left hand area of the face panel PCB.
    3. Attach one end of the enclosed four pin cable assembly onto the connector marked J2 INFRA-RED.  The connector is located on the lower left hand area of the face panel.
    4. Thread the cable assembly through the wire loom.
    5. Attach the other end of the enclosed four pin cable assembly onto the connector marked J6 IR.  The connector is located on the right hand side of the power supply tray.
    6. Close the console and test for proper operation.
       Refer to the User Manual to enable the IRFU.