-
Default IP Ranges For ETC Products Below are the ETC Network addressing standards. Bold numbers or modes are the default for devices that ship with a preconfigured IP. These standard ranges should be used unless a different range is required by the site. ETC Product IP Range Congo 10.101.80.101 to 10...
Posted to
ETC Product Wiki
by
Tracy.Fitch
on
06-18-2013
Filed under: CEM+, CEM3, Congo, Congo Kid, CongoJr, DMX, Element, Emphasis, Eos, Ethernet, Gateway Configuration Editor, GCE, Ion, iphone, ipod, iRFR, IRFU, KnowledgeBase, Legacy Unison, Light Server, Mosaic, NCE, Net2, Net3, Network, Obsession, ObsessionII, Paradigm, Pharos, Sensor+, Show Control, Unison, WRFU
-
Two Port Wallmount Node Two Port Touring Node The ETCNet2 Two Port Node was available as either a wallmount (backbox mounting) version or as a touring version with either two male or two female 5 pin XLR connectors. Similarly to other Net2 products the connectors can be inputs or outputs irrespective...
-
The ETCNet2 DMX Node provides a way to either input or output DMX from a Net2 Network system. The node can also be used in a Net1 system similar to an RIU. There were several variants produced : Connectors could be either front or rear mounted DMX connectors were available as 4 male, 4 female or a mixture...
-
VersionDetect Not working with two ports. ETCNet2 Two Port DMX Nodes prior to v4.0.0 will not understand an Update command from VersionDetect as indicated by the icon. To update these nodes with the version of software the nodes are currently in. This is because two ports prior to version 4 need RCC...
-
Problem: My RFU will not work with my Net2 Video Node. Answer: Make certain that you're video node is running 2.0 code.
-
Question: In which direction do you move the termination switch on the ETCLink/RFU PCB to terminate? Answer: Towards the J5 connector is terminated
-
When equipment goes bad out in the field, it's often extremely helpful if the owner/end user can keep track of the circumstances of the failure. This is especially true when the problem is intermittent and might not occur when the technician is present. Service Technicians are exceptionally skillful...
Posted to
ETC Product Wiki
by
Kelsey Aleckson
on
08-24-2009
Filed under: AAS, Acclaim, arri, ASTS, AVAB, CEM, CEM+, Congo, CongoJr, cRRFU, DAS, Dimmer, Distribution, DMX, ECMUX, Element, ELTS, Emphasis, Eos, ETCLink, Ethernet, Express, Expression, GCE, Idea, Ion, Irideon, K96, KnowledgeBase, Legacy Unison, LMI, Lon, MDD, MDR, MicroII, MicroVision, MIDI, MPE, NCE, Net2, Net3, Obsession, ObsessionII, Pharos, RDM, Response, RFR, RFU, RRFU, RS-232, RVI, Sensor, Sensor+, SineWave, SmartBar, SmartFade, SmartFadeML, SmartModule, SMPTE, Source Four, Source4, Touchscreen, Unison, Vision, WRFU
-
Question Do you need to ground the node? Answer Yes. This helps displace any static electricity that may be acquire.
-
The Net2 node power supply can be either a 12V or a 24V unit. The Node itself can accept voltage from 12V to 30V.
-
Question What is the optimum operating temperature for a 2 port node? Answer 0 degrees to 50 degrees Celcuis 32 degrees to 106 degrees Fahrenheit (This limit is determined by the LCD screen needs.)