To be able to distribute the load I have the following question:
In three phase operation (CEE 3P400 + N + G), how is the phasing for the Smartpack?Is it channel 1-4 phase R, channel 5-8 phase S, and 9-12 phase T? Or is it 1->R, 2->S, 3->T
thanx in advance,
J
Jeroen,
It is 1-4 on R, 5-8 on S and 9-12 on T as you described.
Thanks!
David